Approvals
Every repair above your $1,500 limit reaches you as one request: the quote, the bids and the days waited. Above $5,000 it also needs a second bid.
- Owner limit
- $1,500
- Second bid above
- $5,000
- Decision target
- 2 days
- September requests
- 7
per job; above it you approve
two written bids side by side
from a complete request
4 decided within two days
How long decisions took
The seven September requests grouped by days from request to decision.
Where the waits sit
Selwyn Court went from 4 days to 9, Ashdown Lofts from 3 to 6. Linwood Terrace stayed at 2.
Every request above the limit
Quote, bids and days to a decision for each September request.